The Digital Transformation Mandate
The urban transit authority mandated an Asset Information Model (AIM) at LOD 350 for an 18 km operational elevated viaduct with 12 station interfaces. The 3D model was required for ongoing asset maintenance, structural health monitoring, and planned corridor expansion.
The Challenge of Legacy 2D Archives
All existing structural engineering records were trapped in over 600 disparate 2D DWGs, scanned microfilms, and non-standard PDF drawings created over 15 years. Manual re-modeling in Revit or Tekla was estimated at 10 months and ₹1.5 Cr, with massive risk of dimensional discrepancies.
10 Months Manual Modeling in Revit · Missing Rebar Data · Inconsistent Layers · High Clash Risk on Site
4 Weeks Automated OCR to LOD 350 IFC · Zero On-Site Clashes · Digital Twin Ready · Standardized Metadata
Aagento Generative AI Solution Pipeline
The project replaced fragmented human drafting with Aagento’s four-stage deterministic engineering pipeline:
Deep learning models parsed structural labels, rebar schedules, section markers, and elevation levels across all 600 sheets.
Cross-referenced pier elevations against plan views and transverse cross-sections to reconcile dimensional conflicts.
Automated generation of 3D concrete elements, elastomeric bearings, expansion joints, and internal rebar cages.
Indexed metadata tags (material grades, installation dates, load ratings) attached directly into standard IFC 4.3 schema.
Precision Rebar Cage Extrusion
Aagento’s semantic parsing engine recognized non-standard rebar bend annotations and automatically generated exact 3D parametric rebar cages inside pier caps, pier stems, and pile caps. The spatial precision allowed engineers to simulate crane hoisting sequences for upcoming viaduct widening.
Future-Proof Lifecycle Asset Management
The entire 18 km viaduct corridor was converted into LOD 350 IFC BIM models in 4 weeks—10x faster than manual re-drafting. When a new station flyover was erected at Chainage 12+400, zero site clashes occurred because the digital twin accurately revealed underground utility and pier foundation coordinates.
"Converting 15 years of legacy drawing archives into pristine 3D BIM models in 4 weeks revolutionized our asset management operations and prevented multiple costly on-site clashes."