Pre-Tender Governance Mandate
Before floating an EPC tender for a 380 km State Highway rehabilitation and widening project, the government corporation needed an exhaustive independent engineer (IE) audit of the consultant-submitted Detailed Project Report (DPR).
The Risk of Unchecked Errors
The DPR spanned 1,200 pages across 4 volumes. Manual review typically takes 4 weeks and frequently overlooks cross-table discrepancies between drawing dimensions, Bill of Quantities (BOQ) sums, and current State PWD Schedule of Rates (SOR). Uncorrected errors lead to post-award claims and budget overruns.
4 Weeks Manual IE Audit · Overlooked SOR Inconsistencies · Post-Tender Claim Risks · Unverified IRR Models
48 Hours Audit · ₹18.4 Cr Arithmetic & Rate Mismatches Detected · 100% Proforma 2023 · Actionable Audit Report
Aagento Generative AI Solution Pipeline
The project replaced fragmented human drafting with Aagento’s four-stage deterministic engineering pipeline:
Cross-referenced typical cross-section (TCS) pavement layers against the BOQ line items, flagging under-reported bitumen quantities.
Automated fuzzy lookup against the latest 2025–26 State PWD SOR, identifying 47 line items calculated with superseded unit rates.
Re-ran discounted cash flow and sensitivity simulations for traffic growth rates under MoRTH Vol. 1 Proforma 2023.
Synthesized an itemized 14-page compliance report with exact page citations and corrective recommendations.
Semantic SOR Rate Verification
Aagento’s automated semantic matcher cross-referenced all 340 schedule items against the state government’s latest Schedule of Rates. The software uncovered 47 instances where outdated rates had been copied from previous year schedules, inflating estimated project contingency buffers.
Tender Protection & Financial Integrity
Within 48 hours of ingestion, Aagento flagged ₹18.4 Crore in arithmetic discrepancies, duplicate earthwork entries, and outdated asphalt indexation. The consultant revised the tender schedules before tender notification, eliminating legal liability and contractor arbitration disputes during project execution.
"Aagento’s audit caught ₹18.4 Cr in errors that our manual review completely missed. It paid for itself a hundred times over before we even issued the tender."