Project Background & Corridor Significance
The Western Dedicated Freight Corridor (DFC) is India’s flagship heavy-haul freight railway spanning over 1,500 kilometers from Dadri to JNPT Mumbai. Designed to support heavy 25-tonne axle loads at speeds up to 100 km/h, the project mandates strict grade separation across all intersecting roadways. This critical 120 km package involved 42 complex Road Over Bridges (ROBs)—including 14 major river/canal crossings with spans up to 76.2m and 28 highway flyovers spanning live electrified railway tracks.
The Engineering Bottleneck & Challenge
Traditional execution relied on 3 disparate subcontracted drafting firms. Over a 9-month period, manual drafting produced severe bottlenecks: inconsistent skew pier hammerheads, miscalculated vertical clearances over 25kV OHE (Overhead Equipment), and 7 consecutive drawing rejection cycles by zonal railway authorities. With site mobilization deadlines approaching and liquidated damages looming, the contractor urgently needed an automated, code-aware engineering pipeline.
9 Months Drafting · 3 Subcontracted CAD Vendors · 7 Re-submission Cycles · ₹4.8 Cr Excess Tonnage
21 Days Automated GAD · 1st Submission Approval · Parametric Foundation Optimization · Native DWG
Aagento Generative AI Solution Pipeline
The project replaced fragmented human drafting with Aagento’s four-stage deterministic engineering pipeline:
Digital elevation profiles, track alignment coordinates, borehole standard penetration test (SPT) N-values, and statutory OHE 6.525m clearance envelopes were ingested.
Algorithmic generation of longitudinal elevations, pier cross-sections, superstructure bearing seating, and well foundation scour depths per RDSO standard drawings.
Continuous real-time verification against IRS Steel Bridge Code, IRS Substructure Code, and IRC:SP:84 flyover geometry rules.
Direct export into layered native AutoCAD DWG/DXF sheets, IFC 4.3 solid BIM meshes, and automated Bar Bending Schedules (BBS).
Foundation & Geotechnical Optimization
Aagento’s foundation sizing solver evaluated dynamic earth pressures, soil strata N-values, and Lacey maximum scour depths across all 42 locations. Instead of conservative manual over-dimensioning, the engine parametrically computed optimum well steining thicknesses and curb depths, directly eliminating ₹4.8 Crore of excess concrete and reinforcement steel without compromising safety coefficients.
Measured Quantitative Outcomes & ROI
By transitioning from fragmented subcontracted drafting to Aagento’s automated generative platform, the consortium compressed a projected 9-month drafting timeline into just 21 days. Every single GAD package passed formal RDSO scrutiny on its first submission with zero drafting revision cycles. Crucially, the early drawing clearance unlocked immediate piling and earthwork mobilization, protecting the project critical path.
"Aagento transformed how our structural team handles railway bridge submissions. What previously consumed entire teams of CAD draftspersons for 6 to 9 months is now generated, verified against RDSO standards, and formatted for approval in days. It is an indispensable competitive advantage for mega corridor bids."